Top surfaces complete

Added the last blackwrap on quadrant 2. I also added the Beta-cloth around the ascent stage attachment points. As Beta-Cloth I used the completely faded care instructions from an old over-washed pair of boxers because that was the only white synthetic fabric I could find around the house. :)

Could not resist taking a few pictures with the one finished leg attached.


Outrigger strut assembly coating is the next step.
If anyone have good references of the outrigger ventilation flange thingy on the top struts I would be grateful if I could have a look!

Leave a Reply

Your email address will not be published.

You may use these HTML tags and attributes: <a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <s> <strike> <strong>